Loading...
HomeMy WebLinkAbout2018-06-26-addendum-4-technical-design-guidelinesGeneral Note: 1. Update all dates in footers to read: 06/26/2018 Table of Contents 1. Adjust all page numbers for Chapters after 02 EXISTING CONDITIONS to account for the two new pages added by the Checklist. DIVISION 02 1. Page 31, after Section 101, I, add the following: J. The design professional and/or contractor shall assess existing project site conditions for all items on TCCD PRE-RENOVATION CHECKLIST on pages 32-33 of this document and all other relevant items. 2. Immediately following Page 31, add pages 1-2 of the attached TCCD PRE- RENOVATION CHECKLIST document. DIVISION 21 3. Page 120, Section 101, A, revise to read as follows: A. STEEL PIPE AND FITTINGS 1. Fire sprinkler piping NPS 2 or smaller shall be Schedule 40 and may be joined by either threaded fittings, welding or grooved coupling fittings. Fire sprinkler piping larger than NPS 2 shall be Schedule 10 (minimum) and may be joined by threaded fittings, welding or grooved coupling fittings. All grooved coupling fittings shall be Victalulic brand, domestically- manufactured 73-009N FireLock EZ type fittings. Grooves for piping NPS 2 or smaller shall be machine-rolled, not cut. Groves for piping larger than NPS 2 shall be machine-cut, not rolled. Where piping is welded, all welds shall be primer coated. Flex drops must have 2 inch minimum bend radius. All pipe and fittings shall be domestically manufactured. 4. Page 123, immediatelyfollowing Section 101, I, 3 add: 4. Signage must be visable and must reflect: a.Map, with labels, indicating which area that riser serves. b.Shut off valve location. c.Main Riser - indentification of attached antifreeze, dry, pre-action, and auxillary systems. d. Anti-freeze system design information. END OF ADDENDUM 4 Addendum No. 4TECHNICAL DESIGN GUIDELINES 06/26/2018 PRE-RENOVATION CHECKLIST ☐ Verify location of existing devices ☐ Verify system capacity ☐ Provide a list of existing non-compliant items and/or safety issues Please rate the condition of the existing plumbing lines. Provide or attach details. ☐ GOOD ☐ FAIR ☐ POOR Please rate the condition of the existing plumbing lines. Provide or attach details. ☐ GOOD ☐ FAIR ☐ POOR ☐ Smoke Test of existing sewer lines. ☐ Provide a list of existing non-compliant items and/or safety issues ☐ Supply ☐ Return ☐ Temperature sensor Division 21: Fire Suppression Division 22: Division 22: Plumbing Division 23: Heating, Ventilation, Air Conditioning ☐ Building Automation System (BAS) ☐ Provide a list of existing non-compliant items and/or safety issues ☐ Verify locations of electrical panels and number of spare circuits, if applicable ☐ Verify locations and condition of emergency and egress lighting ☐ Verify if nLight Controls are installed and device locations (including connected bridge/ gateway or nearest nLight bridge and gateway) ☐ Verify locations and functionality of BRG clocks and code blue devices ☐ Verify location of existing fire alarm devices ☐ Provide a list of existing non-compliant fire alarm items and/or safety issues Please rate the condition of the existing plumbing lines. Provide or attach details. ☐ GOOD ☐ FAIR ☐ POOR ☐ Flag locations of existing sprinkler heads ☐ Test condition of existing irrigation lines Please rate the condition of the existing irrigation system. Provide or attach details. ☐ GOOD WORKING ☐ PARTIALLY WORKING ☐ NON – WORKING Division 25: Integrated Automation Division 26: Electrical Division 28: Electronic Safety & Security/ Fire Systems Division 32: Irrigation